Sinclair Community College - Building 8
Construction work is currently taking place at Building 8. To enter the building, you will need to use the basement level (Level 0) of Building 4.
All buildings are connected by tunnels, and once you reach the basement of Building 4, there will be signs directing you to Building 8.
From there, you can go upstairs to Level 1 in Building 8 to access the gym.
Many have been parking on the third level of the parking garage in Lot A and then walking over to Building 4 using the walkway over the road. After entering Building 4, they head down to the basement level.